QA Wednesday January 6, 2010
Posted by Pam in KC in goals.trackback
Quilting Accountability.
Over the weekend I worked on Carolina Christmas and got through the first part of step 4. At that point I needed to cut more fabric, and if I did, I would continue to work on it when I really needed to finish the DWR so I can start the hand quilting. So, I temporarily set aside Carolina Christmas, and finished up my DWR piecing last night.
I’m participating the Sylvia’s Bridal Sampler BOW, so I will finish piecing this week’s block and a couple of swap blocks before tackling the borders on Ladder to the Stars. I continue to work on Oklahoma Backroads as my leader/ender.
It is my intention to sandwich both the DWR and the Music Quilt this weekend so I can start quilting them next week. As long as my wrists holds out I’ll spend 30 minutes each day on the DWR. I expect the music quilt will take me several evenings to machine quilt.
Thanks Bari for starting the Accountability Challenge.
Comments
Sorry comments are closed for this entry
Woo hoo! You finished piecing your DWR! I am so excited, and doesn’t it feel GREAT to get that part finished?
Way to go!
I’m so excited about your finish! Way to go!
So did you get a Blazing star done to your liking yet? If you have any tips, pass them along please! I’m a bit worried after reading your post on the SBS list.
After I posted last night I ripped it out and tried again. The diamonds are done now, but I haven’t had a chance to put it all together. Believe it or not, it really is a simply block — if you pay attention, Is started to write how I got it to work, but it was getting lengthy. Tonight I’ll see if I can do a picture tutorial.
Wow a finish already. Way to go.
Good job at finishing the DWR. I am working on my carolina christmas too… much slower than you tho