Half a Music Quilt March 19, 2009
Posted by Pam in KC in music quilt.comments closed
Off work on time, I fixed dinner and then puttered around the house before sitting down at the sewing machine. One more row has been added to DH’s music quilt. I’m half way there now.
Stash Report Week # 11 March 15, 2009
Posted by Pam in KC in music quilt, Stash Busting Report.comments closed
I still don’t have the Poinsetta quilt bound. I got called from work and spent most of the day working. I took a quick nap, ate dinner and then settled in for the evening shift. That went a lot smoother, but I still had to hang around, so I worked on the pieced sashings for the music quilt. The fabric was already cut for the sashing, so I’m only counting the fabric I cut for the binding.
Fabric Added this Week: 0 yards
Fabric Added to Date: 50.25 yards
Fabric Used this Week: .5 yards
Fabric Used to Date: 22.08 yards
Net Stash: +28.17 yards