Quilts in Progress – 2013
In my quilting, I tend to get distracted easily. Or maybe I get bored. Whatever the reason, I have many (some would say too many) Quilts in Progress. I hate to call them UFOs (UnFinished Objects) because I do intend to finish them some day. This list does not include completed tops which have their own page. Click HERE or on the link to the right to see the 2012 list.
- Christmas BOM -8/21/2003
- Hancock Star BOM ** – 4/12/2004
- Sisters Swap – December 2005
- Mom’s Sweatshirt ** – 12/15/06
- Green & Cream Swap ** – Fall 2006
- Compass Lone Star ** – January 2007
- Border Class Sample – 2007
- Redwork Snowmen – January 2007
- Sylvia’s Bridal Sampler – 1/27/07
Black & Bright Swap– May 2007 – Top Completed 4/29/13- Estate DWR – Spring 2008
- Victory Quilt – Spring 2008
2008 Retreat Swap– 4/21/08 Top Completed 5/18/13- QIAD Flying Dutchmen Lotto – 2/9/09
- Christmas Blocks from Lee ^ – 4/17/09
Squares Blocks from Lee^ – 4/17/09 Top Completed 3/30/13- Purple Blocks from Lee ^ – 4/17/09
- Log Cabin Blocks from Lee ^ – 4/17/09
- Baskets from Lee ^ – 4/17/09
- Blue Ridge Beauty * – 5/18/10
- Red, White & Blue Sampler – 5/28/10
- KVQG BOM 2010-2011 – 7/10/10
- QAYG String Blocks ** – 11/16/10
- Mom’s Thangles BOM ^
Mom’s JoAnn Sampler ^– hasn’t been started so removed from list- Jane’s Hourglasses ^
- Sheryl’s Churn Dash Blocks ^
- Postage Stamp* – Spring 2011
- Candy Sunflower Seeds – 5/21/11
- Orca Bay – 11/18/11
Bellanca Bag– 12/13/11 – Completed 5/9/13Frog Quilt– 1/11/12 – Completed 12/29/13- Just Takes Two – 2/11/12
- Eeyore – 5/12/12
- Faux Applique – 5/14/12
- Blue Strings – 6/16/12
3″ Spools* – 8/20/12 – Completed 11/9/13- Twas the Night Before Christmas #1 – 12/30/12
- Twas the Night Before Christmas #2 – 1/1/13
- Dorothy Young Alphabet BOM – 1/11/13
Kansas Troubles Stacked 4-patch– 2/10/13 – Completed 3/17/13Nifty Thrifty– 3/3/13 – Completed 7/19/13- Rectangle Wrangle – 3/3/13
- Scrappy Trips – 4/4/13
- Sew Scrappy – 4/24/13
- String HST Wall Hanging – 7/22/13
Orphan Blocks– 7/19/13 – completed 8/3/13Aiming for Accuracy Quilt-Along– 8/4/13 – Completed 10/21/13Deadline Project I– 9/15/13 – Completed 10/1/13- Bricks and Stepping Stones * – 11/16/13
Deadline Project II– 10/28/13 – Completed 11/27/13RWB Aug 2013 Quilt C– 11/18/13 – Completed 12/9/13
* – Leader/Ender Projects
** – Quilt As You Go Projects
^ – Inherited Projects
Comments»
No comments yet — be the first.